Question # 37

The model shows high internal gains from lighting and plugs. The owner asks for the most effective sequence to reduce energy and avoid oversizing. What should the team do?

Options:

A.

Install larger chillers to cover worst-case days

B.

Reduce loads first—lower LPD with efficient luminaires and daylight dimming, manage plug/process loads with advanced controls—then right-size HVAC and verify sequences through commissioning

C.

Keep the design and widen temperature setpoints to save energy

D.

Increase ventilation continuously to “flush heat out”