A maintenance team inspected a cooling system on Monday. The inspection revealed minor wear on two valves, but no immediate repairs were required. The supervisor scheduled replacement of the valves during the next planned shutdown to avoid disrupting production. The report stated that operating the system until the shutdown posed no safety concerns.

What is the main reason the valves were not replaced immediately?

Options:

A.

The replacement parts were unavailable.

B.

The system had already been shut down.

C.

The wear did not create an immediate safety risk.

D.

The inspection was incomplete.